The construction steps of hard acrylic floor

Issuing time:2021-08-12 15:32

Preparation foundation: Clean up debris, grave on the site to ensure that the foundation is flat, and carry out the necessary filling and compaction.

Laying the bottom layer: lay a layer of concrete or asphalt, usually 5-10 cm thick.

Mix paint in proportion: Mix SSG sports’ acrylic pigments, adhesive 108, cement, sand and water in proportion to make a uniform paint.

图片1.png

Apply primer: Apply a layer of primer on the surface of the underlying concrete or asphalt.

图片2.png

Apply acrylic paint: Apply the mixed acrylic paint evenly on the surface of the primer

Flattening the surface: Use professional tools to flatten and compact the coating surface, and treat the seams between the coatings.

Secondary coating: After the first layer of paint is dried, apply the same layer of acrylic paint to improve durability and aesthetics.

图片3.png



Color coating : Scrape Acrylic Surface Color Layer with inner and outer court separated

图片4.png

图片5.png


Line making: draw the line after the surface dried.

图片6.png

Completed: After the surface and line is fully dried and the necessary cleaning work is carried out, the construction of the hard acrylic floor of the tennis court is completed.

图片7.png

Notes:

Paint construction should avoid severe weather conditions such as high temperature and strong wind.

Before construction, the quality and storage time of the coating should be checked, and the products that meet the standards should be selected.

Before construction, you should carefully read the product manual and operating specifications to ensure that the construction follows the correct steps.